ATAMIR-WSMR
   
Home
 
 
About ATA
 
 
About MIRATEK
 
 
ATAMIR  
ATAMIR-WSMR  
Contact Us
 
 
Job Postings  
   
Newsroom  
 

                          
 
                  ATAMIR Big Crow Program Support

Big Crow Program Management Services (BCPMS), in a follow-on contract to a previous MIRATEK contract, provides technical, administrative and program management support for all Big Crow Program Office efforts, including:  providing electronic warfare and electro-magnetic (EW/EM) environments; interface with customers; and oversee general support contractors to ensure program requirements are contractually and financially met; Supplying a variety of air borne and ground platforms to perform electromagnetic vulnerability assessments, experiment support, research, test and evaluations (T&E), and training in a worldwide deployable mobile instrumented test and training range. ATAMIR provides a myriad of program management support functions to the BCPO through our unparalleled, realistic understanding of Big Crow operational and technical support requirements. We have a standing team of proven professionals, management fully responsive to all customer requirements, an experienced, multi-functional workforce, and a demonstrated capability to get the job done right—the first time. The scope of this effort includes technical, analytical, advisory, and management support to the Space Electronic Warfare Detachment Big Crow Program Office (BCPO). ATAMIR’s primary tasks include program control support, management analysis and advisory assistance, engineering support, technical review and analysis, air service management, resource scheduling, Local Area Network/Wide Area Network (LAN/WAN) administrative support, data review and analysis, and Computer-Aided Design (CAD)/graphics design support, and logistical management of over $300M in government property.


 

 

Big Crow Air Test Bed  
Performs a variety of work, including:
 

 

          Refueling tests with new
        
      aircraft types

          Airborne laser trials

          Electronic countermeasures
        
      testing


  

 

 

 

 

 


Copyright © 2005-2007  ATAMIR-WSMR All rights reserved.  Revised:  07/03/2007